Size an IT test workstation
An IT technician must run a client VM and a test-server VM together to validate a desktop rollout. Host peak demand is 6 GB and each VM needs 4 GB. Plan at least two simultaneous VMs with 25% capacity margin and a matched RAM kit costing at most $95. The board supports every listed capacity; use the supplied peaks for this model and measure the actual workload before deployment.
